Within the scope of the Production unit for the manufacture of luxury products by Hipic Prod Impex S.R.L., Sibiu city, Sibiu county, the exterior improvements of the production hall included a wide range of categories of road works:
-
the execution of asphalt clothing in three layers on a foundation of crushed stone and ballast, both on the roadway area and in the parking area
-
ensuring pedestrian circulation through the execution of sidewalks
-
execution of road concrete clothing on a foundation of crushed stone and ballast, in the docking area and at the equipment platforms
-
execution of grass areas by placing fertile soil
-
ensuring the safety of road traffic
Considering the scale of the project and the requests of the beneficiary, the works performed meet the highest quality standards.
Duration of execution: 14 months
Period of execution: 2021 - 2022