The complete modernization of the DC4 communal road, from Vistea town, Brasov county, which connects the Rucar and Cincsor towns, consisted of the following categories of works:

  • from km 0+000.00 to km 4+100.00 isolated repairs were carried out, in the form of boxes, of the entire road structure (infrastructure and binder layer)

  • from km 4+100.00 to km 6+279.00 the entire road infrastructure was executed

  • two layers of asphalt were laid along the entire length of the road

  • the road part, made of asphalt mixture, is protected by verges made of crushed stone

In order to direct the rain waters and remove them from the road infrastructure, earth trenches and transversal tubular floors were executed.

Traffic safety is ensured by longitudinal markings, traffic indicators and the installation of a metal parapet.

Duration of execution: 7 months
Period of execution: 2022 - 2023

  • Area: 31.395 square meters

    Road length: 6.279 m

    Two layers asphalt clothing: 25.116 square meters

    Crushed stone verges: 6.279 square meters

  • Earth trenches: 1.800 m

    Tubular floor Ø1000 mm: 5 pcs

    Metal parapet for traffic safety: 86 m