The dirt road located in Bradu town, Avrig city, Sibiu county, was modernized through the execution of the following categories of works:

  • execution of two layers of asphalt covering on a foundation of crushed stone and ballast

  • ensuring the drainage of rainwater through the execution of perimeter ditches on the roadway

  • execution of tubular floors, at the accesses to properties and side roads, from PPMI SN10 Ø400 & 500 mm, with a minimum length of 6.0 m, with reinforced concrete slabs and drums, cast monolithically

  • ensuring the safety of road traffic

The modernization of the street increased the level of comfort of the residents in the area and improved road safety.

Duration of execution: 5 months
Period of execution: 2021

  • Area: 6.700 square meters

    Road length: 526 m

    Two layers asphalt clothing: 4.596 square meters

  • Laying curbs: 1.122 m

    Perimeter gutters: 670 m

    Ø400 & 500 mm tubular floors: 58 pcs