The object of the execution was the complete rehabilitation and modernization of Gradinilor street in the city of Agnita, Sibiu county, through:

  • rehabilitation and expansion of drinking water supply network and rain water sewer network

  • execution of two-layer asphalt covering on a foundation of crushed stone and ballast

  • ensuring pedestrian circulation through the execution of sidewalks and a pedestrian area

  • ensuring the drainage of rainwater and traffic safety

  • unitary execution of the accesses to the properties

  • execution of a reinforced concrete retaining wall

On the entire surface of the roadway, an asphalt coating was executed in two layers. The sidewalks were paved with self-locking concrete pavers and the green areas were landscaped with topsoil and grass. A pedestrian area paved with cubic stone was also executed to beautify the area.

Duration of execution: 7 months
Period of execution: 2020-2021

  • Area: 5.628 square meters

    Road length: 536 m

    Two layers asphalt clothing: 1.971 square meters

    Paved sidewalks: 1.108 square meters

    Paved pedestrian area: 298 square meters

    Grass areas: 2.383 square meters

  • Paved parking lots: 166 square meters

    Laying curbs: 1.677 m

    Gutters: 156 m

    Concrete retaining wall: 50 m

    Rain water sewer network Ø200 - Ø400 mm: 226 m

    Drinking water supply network Ø32 - Ø110 mm: 231 m

Photo Gallery