The purpose of the executed works was the connection to the water supply network and the evacuation of household water from the site of the Polycontact Hermannstadt S.R.L. factory, Ocna Sibiului city, Sibiu county. These works consisted in:

  • making a connection to the public drinking water network with a PEHD PN10 Ø63 mm pipe, including the water meter inspection chamber

  • execution of the discharge network, from PEHD PN10, Ø110 mm pipes, from wastewater pumping stations till the concrete inspection chamber located at the entrance to Ocna Sibiului city

  • execution of OL Ø100 and 200 mm road underpass protection pipelines
  • improvement of the discharge area in the ANIF canal of the rainwater sewage network

The executed works serve both the existing constructions and platforms, as well as the future expansions of the factory.

Duration of execution: 2 months
Period of execution: 2022

  • Total length of installed pipes: 886 m

    PEHD PN10 Ø110 mm pipes (discharge network) : 870 m

    PEHD PN10 Ø63 mm pipes: 16 m

  • Concrete inspection chambers with a diameter of 1.000 mm: 5 pcs

    OL Ø100 and 200 mm road underpass protection pipeline: 29 m

    Improvement of the discharge area in the ANIF canal of the rainwater sewage network